Get a quote
The same warehouse before coating: bare, diamond-ground concrete with grinder swirls and hairline cracks
A freshly coated warehouse floor, glossy enough to mirror every ceiling light

Epoxy & resin flooring

Poured epoxy.
Zero seams.

Seamless epoxy floors for garages, homes, showrooms, kitchens and warehouses in Nairobi and across Kenya. Ground, primed and poured start to finish.

Walk on it
24h
Drive on it
72h
Workmanship
5yr

Six systems. One crew.

01 / ServicesEvery floor starts as bare concrete

  1. An open-plan living room on a high-gloss metallic epoxy floor with bronze and charcoal veining, mirroring the garden doorsClear topcoatDecorative coatPrimerGround slabPoured build2 mmOn site3 days
    Pigmented or metallic epoxy, poured seamless · UV-stable clear topcoat

    Decorative epoxy

    Metallic, 3D, marble or a plain solid colour, poured seamless over a ground slab. Glass-smooth in a living room, tough enough for an office corridor.HomesOfficesShowroomsOpen system 01
  2. A home garage with a grey, white and charcoal flake floor and a dark SUV parked on itPolyasparticVinyl flakePigment basePrimerGround slabTo parking72 hOn site2 days
    Pigmented epoxy base · vinyl flake broadcast to rejection · two-coat polyaspartic seal

    Flake floors

    Vinyl chips broadcast over a pigmented base, as a light speckle or full cover, then locked under a polyaspartic topcoat. Hides dust, shrugs off hot tyres and oil.GaragesWorkshopsWashroomsOpen system 02
  3. A food processing hall on a red-oxide polyurethane floor, damp from washdown, between steel tanks and a conveyor lineSeal coatUrethane mortarPrimerGround slabWashdown120 °CTrowelled6–9 mm
    Cementitious urethane mortar, trowelled 6 to 9 mm · coved and drained

    Urethane cement

    Ultra-wear-resistant polyurethane cement, trowelled thick for steel wheels, pallet traffic and hot washdowns. Where a standard epoxy would chip, this keeps going.Food plantsDairiesBreweriesOpen system 03
  4. A stainless steel commercial kitchen on a textured quartz floor with coved skirting and a slot drainSeal coatQuartz broadcastBody coatPrimerGround slabWet gripR11Built up≈3 mm
    Coloured quartz, double broadcast · grouted, sealed and coved · ≈3 mm

    Quartz broadcast

    Coloured quartz broadcast into the resin and sealed in, for a textured floor that keeps its grip when wet. Coved at the walls, with no grout lines to hold bacteria.Commercial kitchensClinicsPool decksOpen system 04
  5. A loading bay on a grey heavy-duty epoxy floor with yellow safety lanes, a forklift and pallet rackingChemical topcoatEpoxy mortarMoisture primerGround slabMortar bed4–6 mmPouredin bays
    Aggregate-filled epoxy mortar screed, 4 to 6 mm · laid in phased bays

    Heavy industrial

    Heavy-build coatings rated for forklifts, loading docks and chemical spills. Poured in phases so the operation keeps running.FactoriesLoading docksGo-downsOpen system 05
  6. A workshop floor mid-repair: old red coating peeling away on one side, ground concrete with a filled crack on the other, and a floor grinder with its dust extractorNew systemRebuilt & levelledGround slabPull-off min.1.5 MPaSurveyday one
    Survey, strip, rebuild, re-lay · nothing new goes on until the old floor is pull-tested

    Repairs & recoats

    Cracks, spalling and peeling DIY coatings ground out and rebuilt before anything new goes down.Crack repairFailed coatingsLevellingOpen system 06

Take a bay to open itOpen · 01 Decorative epoxyEvery floor starts as bare concrete

Four days from bare slab.

02 / ProcessA typical 40 m² garageThe full four days

  1. Survey

    Survey & moisture test

    We read slab moisture and hardness before we recommend a system, not after it fails.

    A technician in hi-vis kneeling on a bare garage slab, pressing a moisture meter to the concrete
  2. Prep

    Diamond grinding

    Planetary grinders open the concrete to a proper profile. Dust goes straight into a HEPA extractor, not your house.

    An operator in ear defenders walking a planetary floor grinder across a slab, hosed to a dust extractor
  3. Repair

    Cracks & joints

    Every crack is chased, filled with rigid epoxy mortar and ground flush so it can't telegraph through.

    Gloved hands trowelling grey epoxy mortar into a chased-out crack in ground concrete
  4. The pour

    Prime, then flood the floor

    Body coat mixed in small batches, pulled with notched squeegees and back-rolled on spiked rollers to release trapped air.

    Crew in hi-vis spreading white epoxy across a warehouse slab with squeegees
  5. Seal

    Topcoat

    UV-stable polyaspartic seals everything in. Anti-slip grit goes wherever feet get wet.

    An installer in spiked shoes rolling a clear gloss topcoat over a grey flake garage floor
  6. Handover

    Walk on it

    Light foot traffic after 24 hours. Park the car after 72. We hand over care notes and the warranty on the day.

    A finished high-gloss flake garage floor with an SUV parked on it and someone stepping onto it

What goes into the floor.

03 / Materials & toolsHardware-store kits are mostly waterAll eleven, drawn to scale

Base coat

100% solids epoxy

No solvents, so nothing evaporates and nothing shrinks. One coat builds as thick as ten coats of a water-based kit.

Solids
100%
Film build
0.5 to 3 mm
Compressive
70+ MPa
Topcoat

Polyaspartic

Won't yellow in sunlight. Tougher against hot tyres than epoxy alone.

Recoat
1 h
Yellowing
ΔE < 2
Gloss
15–90
Primer

Moisture-barrier primer

Stops vapour pushing up from the slab and lifting the coating.

Holds to
95% RH
Coat
250 µm
Decorative

Metallic pigments

Pearlescent powders mixed on site for movement and depth.

Dose
2% w/w
Mixed
on site
Decorative

Vinyl flake blends

Twelve stock blends, or we mix one to your colours.

Blends
12
Chip
6 mm
Grip

Anti-slip aggregate

Aluminium oxide broadcast into the topcoat for wet areas and ramps.

Grit
46–60
Wet
R11
On the truck

This is the actual day-one load-out. Ask anyone quoting against us to show you theirs.

Load out
day one

Job AKF/LO-0247Crew 02Stage Grind & prep

  • Principal plantPlanetary grinder, 450 mm headThree passes on 30-grit metal bonds before a single pail is opened. Takes two of us to get it down the ramp, and it is the line every cheap quote leaves off.

    180 kg

  • H-class extractor, ducted to the headSilica caught where it is made. Your staff keep working two bays over.

    1 unit

  • Moisture meter & calcium chloride kitAbove 4% and the slab will lift a good floor weeks later. The reading picks the primer. No test, no pour.

    4% max

  • Forced-action mixer & clean decant pailsTwo minutes at 400 rpm, sides scraped. Most floors we are called out to repair failed here, not in the tin.

    400 rpm

  • Gauge rake, spiked roller, spike shoesThe rake is what decides whether you paid for 2 mm of resin and got 2 mm.

    ±0.2 mm

  • Sundries: resin & hardener · spare diamond segments · crack-chase blade · edge tape · offcut board to keep your forklift off a green floor

    200 L

Same load-out for a 46 m² garage as for a 1,200 m² warehouse. Only the days on site change.

1.4 ton site

Signed on handover · site contact

Date

Form LO-02 · rev 4 · page 1 of 1 · retained by client

Three floors, three owners.

04 / Clients

Homeowner46

My garage went from the room I hid from guests to the first room I show them. Hot tyres, oil, nothing marks it.

Wanjiru M.Wanjiru M.Flake system

Restaurant owner85

We passed our health inspection on the first visit. The coved edges alone were worth it.

Chef Amara NjorogeChef Amara NjorogeQuartz broadcast

Showroom manager310

The crew showed up on the day they said, worked around our opening hours and left the place cleaner than they found it.

Kevin MwangiKevin MwangiMetallic epoxy
05 / Contact

Contact

Send us a messageAKY-C-····

General enquiry